Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 12/18/24 in all areas

  1. Wheels and bearings in,motor and clutch now mounted.playfield artwork ready.soon be putting electrics in.
    3 points
  2. Cabinet looking good and fits and locks very well.now time to get playfield done and make final holes in front pannel for coin slot,payout and release knob.
    1 point
  3. Moving on.i now have my metal parts.been working on cabinet today.now being assembled. Hole is now cut for top sign and mounted playfield to front pannel to make sure it fits.wheels assembled onto drive shafts.lo5s to do.
    1 point
×
×
  • Create New...